Outing: New Traffic Control System "AISS '09"

Time: 2010 Feb 26 15:30 - 16:30
Summary:

To All Working Press Members:

Urgent Notice to Working Press Members
New Traffic Control System "AISS '09"

Description:

Visit A Brand-New Traffic Control Room

Traffic control systems and disaster prevention systems have been replaced prior to the opening of the Central Circular Route Yamate tunnel (Route No.3 ~ Route No.4). The work has now reached the final stage and in the lead up to the opening the new traffic control system will be opened to the press. The name of the new traffic control system is "AISS '09" (Advanced & Integrated Smartway System).

The traffic control room integrates a large-sized projector system with flexible and usable images that coordinate with the operator's console. These factors will contribute to the effective management of traffic control and operations.

The New Traffic Control System
Date: 2010/2/26 (Fri) 15:30~16:30 (check-in 15:15~15:30)
Site: Metropolitan Express Co., Ltd. West Tokyo Operation Bureau, Traffic control room.
Program: - Introduction of Metropolitan Expressway.
- Introduction of Traffic control system and disaster prevention system.
- Exhibition of the traffic control room.

Please reserve in advance at the reception desk (3211-3161) so that we may make the appropriate preparations. Reservations and cancellations are not complete without confirmation.

Special Project Committee

Posted by Wayne Hunter on Wed, 2010-02-24 19:36
posted in: